Exhibition demo
One project brief in. A full CDM 2024 compliance set out.
Pick a pre-loaded project or paste your own brief. The SmartCDM engine reads it the way a competent CDM adviser would — extracting the project record, screening DOSH notifiability, mapping duty-holders, and generating a HIERAC risk register with ERIC controls, inherent vs residual scoring, a Job Safety Analysis and the owner's H&S File information.
Smart extractionDOSH notifiabilityDuty-holder mappingHIERAC + ERICPCI · CPP · H&S FileDRA1–DRA3JSA & Method StatementOwner handover
Pre-loaded demos
Project brief
1692 charactersTypically 10–25 seconds. Nothing is saved — this is a live sandbox.
Project record
Name, site, duration, workforce, phase
DOSH screening
Notifiable or not — with the reason
HIERAC register
ERIC controls, inherent vs residual
Handover pack
H&S File residual information